1. Pre-Work Verification

Confirm Coil Failure & Replacement Need

Verify evaporator coil is the correct diagnosis — confirm leak location, coil damage, or irreparable fouling

Verify Replacement Coil

Confirm replacement coil matches system — tonnage, metering device type (TXV or fixed orifice), refrigerant, and cabinet orientation (A, N, or slab coil)

New Filter Drier On-Hand

A new liquid line filter drier must be installed any time the refrigerant system is opened — confirm drier is correct size and type

Lock Out / Tag Out

Turn off thermostat, disconnect at air handler, and shut off outdoor unit breaker. Verify zero voltage at unit

2. Refrigerant Recovery

Recover Refrigerant from System

Connect recovery machine to service ports at the outdoor unit and recover all refrigerant into a certified recovery cylinder

Oil Acid Test

Test oil sample from system for acid contamination — determines if line set flush or additional driers are needed

3. Removal & Cabinet Access

Gain Access to Evaporator Coil

Remove air handler access panels, blower assembly if blocking access, and any duct connections to the coil cabinet

Disconnect Refrigerant Lines

Braze off or disconnect suction and liquid lines at coil connections. Cap open lines immediately to prevent moisture entry

Disconnect Condensate Drain Pan

Disconnect drain line from old coil drain pan. Inspect drain pan for cracks, mold, or damage — replace pan if needed

Remove Old Evaporator Coil

Slide or lift old coil assembly out of cabinet. Note orientation, metering device location, and any spacers or brackets for reinstall reference

Inspect Cabinet & Blower

With coil out, inspect inside of cabinet for mold, debris, or damage. Clean blower wheel if dirty. Replace blower capacitor if aged

4. Installation

Install New Filter Drier

Braze new filter drier into the liquid line before the coil metering device. Arrow pointing toward metering device. Flow nitrogen during braze

Set & Position New Evaporator Coil

Slide new coil into cabinet in correct orientation. Verify coil is fully seated, drain pan is aligned under coil, and metering device is accessible

Braze Refrigerant Line Connections

Braze suction and liquid line connections to new coil with nitrogen flowing. Inspect all joints for full silver braze penetration

Reconnect Condensate Drain

Reconnect drain line to new coil drain pan. Verify continuous slope to drain point — no sags, no standing water possible

Reassemble Air Handler

Reinstall blower assembly, reconnect supply plenum or duct, and resecure all access panels. Verify no air leaks at cabinet seams

5. Pressure Test, Evacuation & Recharge

Pressure Test with Nitrogen

Pressurize system to 150–200 psig with dry nitrogen. Leak check all new braze joints at coil and filter drier

Triple Evacuation

Evacuate to 300 microns or lower. Break with dry nitrogen, re-evacuate — repeat 3 times for thorough moisture removal

Recharge Refrigerant

Weigh in refrigerant to nameplate charge or verify by superheat/subcooling method. Document refrigerant type and amount

Condensate Drain Flow Test

Pour water into drain pan and confirm it drains freely with no backup. Test condensate pump if installed

System Start & Runtime Verification

Energize system and run in cooling mode. Verify pressures, amps, delta T, and no abnormal noise or frost on new coil

6. Documentation & Close-Out

Photo Documentation

Photograph old coil (leak location if visible), new coil installed, filter drier, braze joints, drain pan, and gauge readings at startup

Refrigerant Log

Document refrigerant type, amount recovered, amount recharged, and technician EPA certification number per Section 608 requirements

Warranty Registration

Register new coil warranty with manufacturer if required. Record coil model, serial number, and install date

Customer Walk-Through & Sign-Off

Explain what was replaced and why, filter maintenance reminder, and warranty terms. Obtain customer signature

Note: Always replace the filter drier when opening the refrigerant system. Never reuse an old filter drier — it cannot be reliably regenerated and will allow moisture and acid to circulate through the new coil.